Production Assistant

Completed Features

Shipped milestones from Sprint 2.1 through Sprint 3.2. Each item is deterministic inspection or report tooling — not marketing claims.

  1. Sprint 2.1

    CompletedInspection

    Deterministic Font Inspection

    Structural font facts from PDF resources — embedding, subtypes, and usage — without OCR or substitution guesses.

  2. Sprint 2.2

    CompletedInspection

    Deterministic Image Inspection

    Embedded image inventory with dimensions, color space, and effective resolution derived from the PDF itself.

  3. Sprint 2.3

    CompletedInspection

    Deterministic Color Inspection

    Declared color spaces, spot colors, and transparency signals read from page content and resources.

  4. Sprint 2.4

    CompletedInspection

    PDF Structure Inspection

    Page boxes, geometry consistency, and structural markers needed for production readiness checks.

  5. Sprint 2.5

    CompletedInspection

    PDF/X Compliance

    Deterministic PDF/X signals and production readiness scoring against the completed inspection report.

  6. Sprint 2.6

    CompletedReports

    Report Search & Filters

    Find findings and section items quickly with search and filters over an existing Production Report.

  7. Sprint 2.7

    CompletedReports

    Report Comparison

    Side-by-side comparison of two ready Production Reports — readiness, findings, and section deltas only.

  8. Sprint 2.8

    CompletedReports

    Export (PDF, HTML, JSON)

    Serialize a Production Report to PDF, HTML, or JSON. No chat history. No uploaded PDF bytes.

  9. Sprint 3.0

    CompletedReports

    Report History

    Browser-only history of previous Production Reports for revisit and compare — no cloud storage.

  10. Sprint 3.1

    CompletedProduction

    Deterministic Press Profiles

    Requirement presets for labeled press profiles. Selection only — no OEM capability claims.

  11. Sprint 3.2

    CompletedProduction

    Workflow Compatibility Engine

    Evaluate a completed report against authored workflow profiles. Deterministic conditions only.

  12. Sprint 3.3

    CompletedProduction

    Production Recommendations Engine

    Grounded next steps from readiness, workflow, press baselines, PDF/X, and structure — every item carries evidence.